Skip to Main Content
Library Logo WOU Home Library Home
Search the library catalog (Primo)
Search WOU Digital Collections

Website: Facilities & Equipment

A guide containing much of the library website content.

Facilities

The Wayne and Lynn Hamersly Library, opened September 2000, is a three-story brick building which incorporates architectural features of historic campus buildings. The driving factors in the design of the building were to allow more seating for students, more collection space, and better student access to computers and other multimedia equipment. The total area is 74,697 square feet, nearly tripling the amount of library space from the former library building. There are over 700 seats, seventeen group study rooms, numerous dataports for laptops, and more than sixty computer workstations. The total project cost $14 million, raised from state funds, bonds, and private donations, and took two years to build.

Floor Plans

Floor plans

First Floor (PDF)
click on map for more detail

Second Floor (PDF)
click on map for more detail

Third Floor (PDF)
click on map for more detail